Construction of Suspension Bridge at Sudi, going on rapidly !
Anish, Sharma Gaire, 17, Feb / 2017-
The work for the construction of Suspension bridge joining Wami and Musikot VDC at Wami-9 Sudi is going on rapidly.
The bridge was swept away by the flood of Shrawan of this year.
The length of that bridge will be 1 hundred 5 metre and the budget of 44 lakh 23 thousand 2 hundred 62 rupees is allotted for the construction of it.
The 5 hundred 33 family will be benefited by the bridge and people will be able to cross the Badhighat River easily.
The work must be done in this fiscal, and all the materials needed are being conveyed.
For the construction of bridge, the committee of 11 members has been formed making Bishnu Khatri coordinator. The locals from Wami and Musikot have got smile on their face seeing the work of construction of the bridge.
No comments: